Saturday 6 December 2014

It's beginning to look a lot like Christmas!!

It's beginning to look a lot like Christmas and that means that our friends from 2Construct will be taking a break. They have a lot they want to achieve before then so I sat down with the Construction Manager this week to pull together an update for all our members. There is so much exciting stuff happening so make yourself a cup of tea and sit down and have a read of what's in stall for the next couple of weeks.

We have added a folder of updated photos to our Facebook page. Please feel free to check it out to see what has been happening behind the hoarding. Facebook Album (you don't need a Facebook account to view)

APARC Centre Entrance
The construction company are currently finalising the curbing and pavement out the front of the centre. They have built a bridge style ramp over the curbing works to allow this to occur. This bridge will be in place until next week. They are aiming to hand back the front of the centre before they leave for the Christmas break with the temporary fencing removed and their construction containers and bins off site.

Construction Hoarding
You will start to see the temporary construction hoarding come down over the next two weeks. This should give you front row seats to the new areas. The timber hoarding will be replaced by sturdy webbing affixed to bollards. Please refrain from entering these areas until they are properly handed over. You will soon see what has been going on behind the walls and how your new centre has been taking shape.

Health Club Extension - Front
The glass window panes will be installed, enclosing the front of the health club extension. This will mean that the construction company won’t have access to the work site from the front of the centre. They will be politely making their way through the health club and entering the site through a temporary door placed in the hoarding. We have asked that entries are kept to a minimum and that members are not interrupted during this time.

Health Club Extension - Back
The glass window panes will be going in next week and the timber hoarding panels will come down. Black plastic sheeting will be put up over the windows to protect the glass from further construction works.


New dry change rooms and corridor to Program Room 2
The construction company poured the slab for the new dry change rooms on Saturday. There will be a corridor connecting the centre with the new dry change rooms and the new program room. This will remain a timber floor until all works are completed in this area so it isn’t damaged. It will eventually be a vinyl surface. You’ll get to enter this space early next year when the health club relocation occurs.

Program Rooms

They have laid the new timber flooring in the new spin/circuit room (soon to be known as program room 2) last week and will now need to apply one coat of floor coating. They have also laid the timber flooring in the Group Fitness Room extension (soon to be known as program room 1). There may be some residual smell from this process. Ventilation plans are in place but if they are not effective enough, we may need to relocate classes. We will keep you updated if this is to occur.













Walls between Café and Stadium
The brick walls will be rendered next week. A 1-1.5m clearance is needed from the wall.  There will be times when areas may need to be cordoned off but we will point you in the right direction.

Curved feature wall near the café
There will be completion works taking place in this area. The wall is going to be a feature of the centre. I look forward to everyone seeing the finished product. There will be trades people working on this wall so we apologise for any isolations of this area.


Western Change room – Deep end of 25m Indoor Pool
This area is very much nearing completion with final painting, fixtures and fittings to be completed before the shutdown period. We look forward to opening this space to customers in the near future.


Outdoor Pool
We are looking forward to using this space for our annual Christmas party and hope to see as many of our members there as possible. The bench seating that is currently being worked on is another area that the construction company are going to try and give us in time. We will also be opening the grassed area for the first time. There will be a choir, jumping castle, face painting and plenty of food at our annual Christmas party so we look forward to seeing you and your family there.


If you have any questions about this update please do not hesitate to contact me on 9885 0333 or via email amanda.craven@ymca.org.au. We thank you again for your patience during these works. I assure you that this short term inconvenience will definitely be worth it when you see how magnificent APARC will be.

Yours in health and happiness


Amanda Craven
Centre Manager
Ashburton Pool and Recreation Centre